Completed assessments of channel and riparian conditions and sediment sources on all major streams within the Bridge Lake watershed.  Made optimum use of historic and recent aerial photography and a low-level helicopter overflight, in order to reduce anticipated delays in obtaining access through private land.  Priorities for channel, fish habitat, and riparian restoration were identified.  Prescriptions were subsequently prepared for fish passage and riparian restoration.  Designed improved major stream crossings to provide fish passage at existing fish barriers at two locations: west of Silver Lake (structural-plate forestry arch) and east of Wavey Lake (concrete-slab forestry bridge).  Supervised the construction of a riparian fence, and riparian planting at Donald Creek.  Obtained permits, administered contracts, and supervised construction.
bridge1.jpg
bridge2.jpg