Completed conceptual, preliminary and detailed engineering to incorporate a new surface water source into the existing water system at a major Okanagan ski resort. Included a 3.5 km supply main and ancillary works, treatment plant and modifications to the existing distribution system. Selected a water treatment process capable of treating multiple surface and groundwater sources. Developed a watershed management plan to minimise risk of contamination.